Projects
Recent Work
City of Sioux Falls Public Safety Campus
The City of Sioux Falls Public Safety Campus offers 100,000 square feet of training facilities and structures on 42 acres for the Police Department, Fire Rescue, Emergency Management, and Metro Communications. Features of the campus include:
- 911 emergency communications
- Metro Communications dispatch facility
- Emergency Operations Center
- Chief Matt Burns Range
- Tactical structures creating dynamic training opportunities for Police and Fire Rescue.
- 13 acre emergency vehicle operations course
- Defensive tactics mat room with use of force training simulator
- EMS simulation lab
- Outdoor and indoor classrooms
- Apparatus storage and personal protective equipment care and maintenance building
- Location: Sioux Falls, SD
- Architect: WKSF – Kansas City
- Final Budget: In Progress
Sioux Falls Chamber Article: Public Safety Campus Nears Completion
Kelo News: A look at the in-progress Sioux Falls Public Safety Campus
Dakotaland News: Public Safety Campus on track to open this fall
Sioux Falls Simplified: Animated Tour
Pigeon605: What’s inside new Sioux Falls Public Safety Training Center
Harrisburg North Middle School
The Harrisburg North Middle School 140,000 square foot school design was intended to enhance the education process with a variety of education spaces including conference rooms and an open pod design for each grade level. The open pod areas encourage social interaction between student and staff in a casual atmosphere. The building is designed for easy administration security and control. Besides classrooms, the school includes technology labs, an art room, family consumer science labs, a media center, gymnasium, two music rooms, a multipurpose physical education room, locker rooms, a large central commons, and a kitchen. This project was completed in November of 2013, on time.
- Location: Harrisburg, SD
- Architect: Architecture Incorporated
- Final Budget: In Progress
Education Buildings
Brandon Valley Intermediate School
- Location: Brandon, SD
- Architect: Architecture Inc.
- Final Budget: $14 Million
Harrisburg North Middle School
- Location: Harrisburg, SD
- Architect: Harrisburg, SD
- Final Budget: $16 Million
Environmental Office & Education Center
- Location: Sioux Falls, SD
- Architect: Koch Hazard
- Final Budget: $1.2 Million
Business
SGS Brookings
- Location: Brookings
- Architect: VanDeWalle Architects
- Final Budget: $15 Million
TJN Enterprises Scrap Recycling Inc
Constructed on 20-acres, this 80,000 square foot two-story scrap metal recycling facility, has an office and outdoor storage area used for nonferrous processing. Shear and baling equipment are on site along with car flattening equipment.
“The facility turned out great, and we’re really excited about it.”
-TJN spokesman David Bernstein
- Location: Sioux Falls, SD
- Architect: Hartman Architects
- Final Budget: $15 Million
American Tire Distributors
- Location: Sioux Falls, SD
- Architect: Hartman Architects
- Final Budget: $4.75 Million
GRACO
Constructed 55,905 square-foot addition. Peska Construction tore down a 480 ft load bearing wall and constructed a temporary wall to the hold the roof structure. This Sioux Falls facility manufactures spray guns, parts and accessories, and provides the following functions:
- Engineering
- Research and Development
- Manufacturing
- Assembly
- Location: Sioux Falls, SD
- Architect: TSP Architects
- Final Budget: $6.9 Million
Lift Solutions
- Location: Sioux Falls, SD
- Architect: VanDeWalle Architects
- Final Budget: $1.9 Million