Projects

Current Work

Sioux Falls Public Training Campus

The 40-acre new construction Training Campus will house the following: 

  • Police Training Campus,
  • Fire Training Campus
  • 911 Emergency Dispatch Center for Sioux Falls and Minnehaha County,
  • 8 building structures to house Administration, Maintenance, 3 Commercial Burn Structures, Residential Burn Structure, EVOC Classroom and USAR Structure.
  • High and Low Speed Vehicle Training courses.

Harrisburg Middle School

This middle school project is 143,000 sq. ft. of new construction which includes:

  • Gym,
  • Commons Area,
  • Theater,
  • Athletic field,
  • Soccer field,
  • Softball field,
  • Athletic track.

114th Fighter Wing Aircraft Maintenance Complex

Education Buildings

Brandon Valley Intermediate School

Consisting of 104,000 square feet, this design included a common area to accommodate 380 students, larger lockers, and an inviting library with large windows. The main focus, however, was the new “hands-on” smart lab. The STEM activities performed in the lab encourage students to show entrepreneurship, to be creative in their approaches and to learn to work independently and in groups. Several stations in the STEM lab include 3D printing, video production and stop-motion animation. “Kids love it. It’s awesome to see them use their creativity and create different ideas,” said Brad Thorson, school principal. “It’s an awesome addition to our school.”

Harrisburg North Middle School

The Harrisburg North Middle School 140,000 square foot school design was intended to enhance the education process with a variety of education spaces including conference rooms and an open pod design for each grade level. The open pod areas encourage social interaction between student and staff in a casual atmosphere. The building is designed for easy administration security and control. Besides classrooms, the school includes technology labs, an art room, family consumer science labs, a media center, gymnasium, two music rooms, a multipurpose physical education room, locker rooms, a large central commons, and a kitchen. This project was completed in November of 2013, on time.

Environmental Office & Education Center

This LEED-certified building with a registered goal of Gold was designed to embody the City’s Leading Green initiative to help implement solutions to environmental, social and economic concerns. These concerns included: energy consumption, air quality, managing land use, increased recycling and conservation of water. This building demonstrates Peska Construction’s innovative response to developing an earth-friendly building using inexpensive, reused and recycled materials. Materials used included tires, QSB panels, wheat board panels and corrugated metals.

Brandon Valley Inspiration Elementary School

Constructed 82,650 square-foot elementary school with:

  • Gymnasium,
  • Lunchroom, 
  • Classrooms,
  • Schoolyard.

Harrisburg High School

Constructed 118,865 square-foot addition which consisted of:

  • Middle School transition wing for 1,200 students, 
  • Gym addition, 
  • Field House,
  • Indoor Track.

Business

SGS Brookings

The SGS Brookings building is comprised of three components: a state-of-the-art lab for testing pesticides and fertilizers; testing area for seed and plant germination; and an office. The 90,000 sq. ft. design is comprised of a steel building with custom tilt-up precast panels, accented with metal panels in the company color at the entry. Natural light flows into the building through clerestory windows surrounding the testing area and floor-to-ceiling windows in the flexible training and break area.

TJN Enterprises Scrap Recycling Inc

Constructed on 20-acres, this 80,000 square foot two-story scrap metal recycling facility, has an office and outdoor storage area used for nonferrous processing. Shear and baling equipment are on site along with car flattening equipment.

“The facility turned out great, and we’re really excited about it.”
-TJN spokesman David Bernstein

American Tire Distributors

Constructed in 2010, this building includes 93,000 square feet of tire distribution and storage. With high-pile racking, the project required specialized air ventilation and sprinkler systems. The entire east side of the structure has 17 loading docks and 8’x9’ overhead doors.

Stock Yard - Highway 18

Located off Highway 18:

  • 40-acre site,
  • 3 cell sanitary lagoon,
  • 150,000 sq ft pen area with Auction Block,
  • 1 animal waste lagoon.

GRACO

Constructed 55,905 square-foot addition.  Peska Construction tore down a 480 ft load bearing wall and constructed a temporary wall to the hold the roof structure.  This Sioux Falls facility manufactures spray guns, parts and accessories, and provides the following functions: 

  • Engineering
  • Research and Development
  • Manufacturing
  • Assembly

Lift Solutions

Constructed 15,300 square-foot structure which contains an office and shop. This manufacturing building provides forklift trucks for virtually every application and equipment, with parts and services to support the Midwest.

Concrete Projects

Denny Sanford Premier Center

Multipurpose facility hosting concerts, conventions, sporting events, and much more.
Turn key concrete package.
Some of the concrete work performed: slab on grade, elevated decks, and dock paving.

Dana J Dykhouse Stadium and Sanford Jackrabbit Athletic Complex

Division 1 football stadium with elevated suites connected to an indoor multi-use athletic complex.
Turn key concrete package.
Some of the concrete work performed: footings and foundations, slab on grade, paving, and elevated decks.

Drake Springs Pool

Family aquatic center including swimming pools and a lazy river.
Turn key concrete package.
Some of the concrete work performed: Cast in place concrete pool, all hard decking for pools, paving, sidewalks.

Walmarts

Retail shopping supercenters.
Peska Construction has performed various concrete construction on 37 Walmarts in the upper Midwest.
Some of the concrete work performed: Footings and foundations, slab on grade, paving, sidewalks.